Case StudiesDigital Transformation
SAP S/4HANA Migration
End-to-end migration from ECC to S/4HANA for a manufacturing leader, lifting operational efficiency by 40%.
Industry: ManufacturingService: SAP Consulting
+40%
Efficiency Lift
-66%
Close Time
-22%
Stock Variance
9 months
Project Duration
We migrated a heavily customized ECC landscape to a modern S/4HANA architecture, simplifying finance, procurement, production and warehouse processes while enabling real-time reporting.
The Challenge
Years of ECC customizations lengthened month-end close, delayed reporting and inflated module-level integration costs. The gap between production planning and procurement caused recurring stock and cost variances.
Our Approach
- Value/complexity analysis of existing processes and customizations (Brownfield vs Greenfield decision).
- Data quality assessment and master data cleansing workshop.
- Test strategy with isolated sandboxes for unit, integration, load and UAT cycles.
- Cutover and fallback plan with a controlled 36-hour go-live window.
The Solution
- Reimplementation of FI/CO, MM, SD, PP and EWM on S/4HANA 2022.
- Role-based Fiori launchpad dashboards.
- E-invoice and banking integrations rebuilt on SAP BTP.
- Real-time operational reporting layer on Power BI.
Results
- 40% lift in operational efficiency.
- Month-end close reduced from 6 days to 2.
- 22% reduction in stock variance.
- Manual reporting effort cut from 18h/week to 3h/week.
"Smartia treated the migration as a real process transformation, not just a technical lift-and-shift. Our close speed changed our operating rhythm."
Let's talk about your S/4HANA journey
We'll assess your SAP landscape and align on the right migration scenario together.
Book a discovery call